Weather permitting, work will begin the week of May 19 on Nebraska Highway 11 (N-11), from the Niobrara River to Butte, from reference post 175.87 to reference post 181.57, according to the Nebraska Department of Transportation.
Knife River Midwest, of Sioux City, Iowa, is the prime contractor for this project. Work includes bridge repair, culvert installation, milling, asphalt paving, flume installation, guardrail installation, and seeding. Traffic will be maintained with temporary traffic signals and a pilot car, and flaggers. A 12-foot width restriction will be in effect. Anticipated completion is Aug. 2025. Motorists are reminded to drive cautiously in and near